/pic1279517.jpg)
Power Grid: Québec/Baden-Württemberg
The two maps included in Power Grid: Québec & Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mégawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW.
What is Power Grid: Québec/Baden-Württemberg
The two maps included in Power Grid: Québec & Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mégawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW.
In Québec, the Canadian province Québec places great emphasis on energy production via ecological hydro power plants. Once an ecological power plant has been added to the power plant market, it will not be put on the bottom of the deck even if it is the highest plant - the highest non-green plant is put on the bottom instead. The two cities of Montreal and Québec City offer several cheap connections, making this map challenging with several layers of decisions for building the best networks.
In Baden-Württemberg, the clocks move differently: The main change focuses on the order of phases of a game round. First, you buy power plants, then you rearrange the player order. Furthermore, as this province is small, several transregional locations may only be connected once Phase 2 begins.
Only a single printing of Power Grid: Québec & Baden-Württemberg will be produced, although the Québec map will remain available in Mégawatts.
Game details
- Players
- 2–6
- Age
- +13
- Duration
- 120 min
- Difficulty
- Heavy
- Type
- Expansion
- Year
- 2012
- Mechanics
- Auction / Bidding · Income · Market
- Categories
- Expansion for Base-game · Economic · Industry / Manufacturing
- Designer
- Friedemann Friese
- Publisher
- 2F-Spiele · Rio Grande Games
Power Grid: Québec/Baden-Württemberg gallery
Power Grid: Québec/Baden-Württemberg on Meeplay
See what the Meeplay community plays and thinks about Power Grid: Québec/Baden-Württemberg, and add your own plays to the record.

What the community says about Power Grid: Québec/Baden-Württemberg
Extra
Games related to Power Grid: Québec/Baden-Württemberg
Power GridBase game · 2004
Power Grid: Bremen/ManhattanExpansion · 2024
파워그리드 재충전 확장: 지도 모음집 (Power Grid Recharged – Map Collection)Expansion · 2022
Power Grid: Europe/North AmericaExpansion · 2021
Power Grid: The New Power Plants – Set 2Expansion · 2021
Power Grid: Middle East/South AfricaExpansion · 2019
Power Grid: Fabled ExpansionExpansion · 2017Games similar to Power Grid: Québec/Baden-Württemberg
City of the Big Shoulders: Burden of DestinyEconomic
Frisian Landscapes (fan expansion to Fields of Arle)Expansion for Base-game
Anno 1800: Die ErweiterungExpansion for Base-game
Roads & Boats: Book of Scenarios Volume 1Expansion for Base-game
The Manhattan Project: Energy Empire – Missile CrisisCivilization
Brass: 2-player boardEconomicEverything about Power Grid: Québec/Baden-Württemberg
How many players is Power Grid: Québec/Baden-Württemberg for?
Power Grid: Québec/Baden-Württemberg plays with 2–6 players.
How long does a game take?
A game takes about 120 minutes.
What age is it suitable for?
It is recommended from age 13.


