Power Grid: High-Voltage DC Transmission Passage C
Economic · Expansion for Base-game

Power Grid: High-Voltage DC Transmission Passage C

Power Grid: High-Voltage DC Transmission Passage C was first released as day 24 of the Brettspiel Adventskalender 2015, and this mini-expansion is playable solely with the Power Grid map of Germany. It was later available in a pack of promos for backing Game Boy Geek 2017 Kickstarter

2–6 players120 minages 12heavy difficulty
About the game

What is Power Grid: High-Voltage DC Transmission Passage C

Power Grid: High-Voltage DC Transmission Passage C was first released as day 24 of the Brettspiel Adventskalender 2015, and this mini-expansion is playable solely with the Power Grid map of Germany. It was later available in a pack of promos for backing Game Boy Geek 2017 Kickstarter

In future years, Germany plans a new high-voltage transmission line from North Germany to South Germany to deliver the electricity produced by wind power to the regions in South Germany with demand for that power. You are collectively building this transmission line, so step by step your power companies will not need to pay connection costs anymore between Cuxhaven and Stuttgart. Sadly, the construction of this transmission line is paid with tax money, so you must pay taxes to supply these cities with electricity.

Specs

Game details

Players
2–6
Age
+12
Duration
120 min
Difficulty
Heavy
Type
Expansion
Year
2015
Mechanics
Auction / Bidding · Network and Route Building
Categories
Economic · Expansion for Base-game · Industry / Manufacturing
Designer
Friedemann Friese
Publisher
2F-Spiele · Frosted Games · Rio Grande Games
Images

Power Grid: High-Voltage DC Transmission Passage C gallery

Community data

Power Grid: High-Voltage DC Transmission Passage C on Meeplay

See what the Meeplay community plays and thinks about Power Grid: High-Voltage DC Transmission Passage C, and add your own plays to the record.

0Plays logged
3Own it in their collection
Average rating
Log a play
FAQ

Everything about Power Grid: High-Voltage DC Transmission Passage C

How many players is Power Grid: High-Voltage DC Transmission Passage C for?

Power Grid: High-Voltage DC Transmission Passage C plays with 2–6 players.

How long does a game take?

A game takes about 120 minutes.

What age is it suitable for?

It is recommended from age 12.

Play Power Grid: High-Voltage DC Transmission Passage C with Meeplay

Save it to your collection, track your plays and find players near you.

Get it on Google PlayDownload on the App StoreOpen the web version